It recommends:
1) 'the Environment Agency to undertake a full floodzone modelling study, including effect of gravel abstraction, of the Windrush delta, including Newbridge Cut and Northmoor New Cut.
Prepare flood control options from the Study conclusions drawn.'
2) 'Hanson's in conjunction with the EA to prepare a satisfactory flood defence solution with regard to their proposed quarrying operations'.
No comments:
Post a Comment