The photos below show clearly the flooding which occurred yesterday (3.6.08) both to property which adjoins the application site as well as to the proposed extraction site/application area.
Page last updated: 13:04 on 03-Jun-2008 Flood status checked every 15 minutes.
Current status: Flood Watch
Status last changed at: 13:04 on 03-Jun-2008
Location: The River Windrush from Bourton-on-the-Water to Newbridge and its tributaries Region: Thames Previous statuses:
All Clear 11:30 on 30-May-2008 Flood Watch 16:38 on 28-May-2008 All Clear 11:52 on 27-May-2008 Flood Watch 12:58 on 26-May-2008 All Clear 15:51 on 15-May-2008
Below: After a couple of days of heavy rainfall, the surface water on the proposed site is most evident. Photo taken on 29th May 2008
Below: On yet another part of the proposed site the water lying on the surface is quite deep ... Photo also taken on 29th May 2008
Below: View over to Park Farm from the public right of way & proposed conveyor belt route.
Above: Photo of Rose Cottage, Northmoor, taken just a few paces from where the one presented by the Minerals Officer to the Planning meeting on 19th May 2008 was taken. It demonstrates how clearly the house can be seen from the footpath, unlike the photo shown to the Planning Committee which showed only the road.
Above: Photo taken in January 2007 looking in a north-westerly direction towards Park Lodge diagonally across the proposed conveyor route, illustrating the significant amount of surface water in winter.
Above: Flooding looking west over Park Farm in July 2007. The water snaking through the field on the left is where a dry dig is proposed. Had the bund had been in place in 2007, all that flood water would have been diverted towards our houses.
All photos kindly sent in by local residents.
For an aerial view of Stonehenge Farm, click on the link below:
An artist's impression of the Stonehenge Farm gravel conveyor crossing at the Standlake to Northmoor road, looking south: driving gear with gravel shute into tunnel.